DVDO2: Red Rr at US 183 bridge nr Davidson 2S
Data processed at Tue 01Nov2022 04:13 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: DVDO2 Red River at US 183 Bridge STATION TYPE: Regulating: Stage = 9.00, Flow = 10940 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 10/31 00:00 0.00 5.54 475 12.47 12.13 10/31 01:00 0.00 5.52 464 12.45 12.11 10/31 02:00 0.00 5.51 459 12.43 12.09 10/31 03:00 0.00 5.50 454 12.42 12.07 10/31 04:00 0.00 5.48 444 12.40 12.05 10/31 05:00 0.00 5.48 444 12.37 12.04 10/31 06:00 0.00 5.46 434 12.37 12.01 10/31 07:00 0.00 5.46 434 12.35 12.00 10/31 08:00 0.00 5.45 429 12.35 11.98 10/31 09:00 0.00 5.44 424 12.98 11.98 10/31 10:00 0.00 5.43 419 13.76 12.70 10/31 11:00 0.00 5.42 414 14.03 13.32 10/31 12:00 0.00 5.42 414 13.91 13.65 10/31 13:00 0.00 5.40 405 13.89 13.57 10/31 14:00 0.00 5.38 398 13.53 13.59 10/31 15:00 0.00 5.37 397 13.56 13.25 10/31 16:00 0.00 5.38 398 13.55 13.27 10/31 17:00 0.00 5.28 382 13.59 13.26 10/31 18:00 0.00 5.35 393 13.30 13.26 10/31 19:00 0.00 5.38 398 12.93 12.94 10/31 20:00 0.00 5.32 388 12.54 12.51 10/31 21:00 0.00 5.30 385 12.52 12.17 10/31 22:00 0.00 5.29 384 12.50 12.17 10/31 23:00 0.00 5.27 380 12.48 12.16