Upstream stations:
Downstream station:
SHEF ID: DVDO2 Red River at US 183 Bridge
STATION TYPE:
Regulating: Stage = 9.00, Flow = 10940
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
12/23 00:00 0.00 5.60 508 12.59 12.25
12/23 01:00 0.00 5.61 513 12.56 12.24
12/23 02:00 0.00 5.61 513 12.54 12.21
12/23 03:00 0.00 5.61 513 12.51 12.19
12/23 04:00 0.00 5.61 513 12.50 12.17
12/23 05:00 0.00 5.61 513 12.48 12.14
12/23 06:00 0.00 5.61 513 12.44 12.11
12/23 07:00 0.00 5.61 513 12.40 12.09
12/23 08:00 0.00 5.61 513 12.37 12.04
12/23 09:00 0.00 5.61 513 13.56 12.04
12/23 10:00 0.00 5.61 513 14.40 13.36
12/23 11:00 0.00 5.61 513 14.18 13.72
12/23 12:00 0.00 5.61 513 14.08 13.81
12/23 13:00 0.00 5.60 508 13.62 13.75
12/23 14:00 0.00 5.60 508 13.60 13.32
12/23 15:00 0.00 5.60 508 13.56 13.26
12/23 16:00 0.00 5.60 508 13.55 13.26
12/23 17:00 0.00 5.60 508 13.42 13.21
12/23 18:00 0.00 5.60 508 12.99 13.05
12/23 19:00 0.00 5.60 508 12.67 12.60
12/23 20:00 0.00 5.60 508 12.67 12.32
12/23 21:00 0.00 5.60 508 12.65 12.34
12/23 22:00 0.00 5.60 508 12.65 12.31
12/23 23:00 0.00 5.60 508 12.63 12.30