DUNK1: Neosho River Nr Dunlap, KS

                                SHEF ID:       DUNK1     NEOSHO R NR DUNLAP, KS
STATION TYPE:
Regulating: Stage = 26.00, Flow = 6358

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/02 00:00 0.10 11.01 49 11.55
09/02 01:00 0.02 11.01 49 11.43
09/02 02:00 0.06 10.94 43 11.55
09/02 03:00 0.14 11.01 49 11.62
09/02 04:00 0.00 11.03 50 11.68
09/02 05:00 0.00 11.04 51 11.65
09/02 06:00 0.00 11.04 51 11.68
09/02 07:00 0.00 11.04 51 11.70
09/02 08:00 0.00 11.04 51 11.79
09/02 09:00 0.00 11.03 50 12.77
09/02 10:00 0.00 11.03 50 13.06
09/02 11:00 0.00 11.03 50 13.00
09/02 12:00 0.00 11.03 50 13.21
09/02 13:00 0.00 11.05 52 13.34
09/02 14:00 0.01 12.27 229 12.89
09/02 15:00 0.00 13.06 408 12.77
09/02 16:00 0.00 13.23 447 12.46
09/02 17:00 0.00 13.20 440 12.47
09/02 18:00 0.00 13.07 411 11.99
09/02 19:00 0.00 12.92 377 12.15
09/02 20:00 0.00 12.75 338 11.98
09/02 21:00 0.00 12.60 304 11.91
09/02 22:00 0.00 12.47 274 11.81
09/02 23:00 0.00 12.36 250 11.83
Data processed at Wed 03Sep2025 04:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DUNL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DUNL.Stage.Inst.1Hour.0.Ccp-Rev
DUNL.Flow.Inst.1Hour.0.Ccp-Rev
DUNL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.