DUNK1: Neosho River Nr Dunlap, KS

                                SHEF ID:       DUNK1     NEOSHO R NR DUNLAP, KS
STATION TYPE:
Regulating: Stage = 26.00, Flow = 6358

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/01 00:00 0.00 12.70 327 12.04
08/01 01:00 0.00 12.60 304 12.01
08/01 02:00 0.00 12.49 279 11.98
08/01 03:00 0.00 12.39 256 11.96
08/01 04:00 0.00 12.30 236 11.94
08/01 05:00 0.00 12.22 218 11.91
08/01 06:00 0.00 12.15 202 11.87
08/01 07:00 0.00 12.09 188 11.88
08/01 08:00 0.00 12.03 175 12.88
08/01 09:00 0.00 11.97 161 13.20
08/01 10:00 0.00 11.92 150 12.75
08/01 11:00 0.00 11.84 131 12.89
08/01 12:00 0.00 11.80 122 13.13
08/01 13:00 0.00 11.80 122 13.33
08/01 14:00 0.00 11.73 109 13.53
08/01 15:00 0.00 11.65 103 13.49
08/01 16:00 0.00 11.67 104 12.87
08/01 17:00 0.00 11.61 99 12.81
08/01 18:00 0.00 11.63 101 12.44
08/01 19:00 0.00 11.62 100 12.34
08/01 20:00 0.00 11.59 97 12.34
08/01 21:00 0.00 11.57 96 12.15
08/01 22:00 0.00 11.55 94 12.11
08/01 23:00 0.00 11.53 92 12.08
Data processed at Sat 02Aug2025 04:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DUNL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DUNL.Stage.Inst.1Hour.0.Ccp-Rev
DUNL.Flow.Inst.1Hour.0.Ccp-Rev
DUNL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.