DUNK1: Neosho River Nr Dunlap, KS

                                SHEF ID:       DUNK1     NEOSHO R NR DUNLAP, KS
STATION TYPE:
Regulating: Stage = 26.00, Flow = 6358

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/24 00:00 0.00 12.37 252 12.31
05/24 01:00 0.01 12.32 240 12.27
05/24 02:00 0.00 12.26 227 12.26
05/24 03:00 0.03 12.13 197 12.23
05/24 04:00 0.02 12.09 188 12.21
05/24 05:00 0.00 12.06 181 12.21
05/24 06:00 0.06 11.94 154 12.20
05/24 07:00 0.00 11.88 141 12.17
05/24 08:00 0.00 11.83 129 12.93
05/24 09:00 0.00 11.88 141 13.55
05/24 10:00 0.00 11.84 131 13.49
05/24 11:00 0.00 11.75 111 13.16
05/24 12:00 0.00 11.81 125 13.16
05/24 13:00 0.00 11.79 120 12.84
05/24 14:00 0.00 11.76 113 12.79
05/24 15:00 0.00 11.74 110 12.79
05/24 16:00 0.00 11.69 106 13.34
05/24 17:00 0.00 11.75 111 13.04
05/24 18:00 0.00 11.74 110 12.72
05/24 19:00 0.00 11.73 109 12.63
05/24 20:00 0.00 11.71 108 12.53
05/24 21:00 0.00 11.71 108 12.41
05/24 22:00 0.00 11.66 103 12.40
05/24 23:00 0.02 11.65 103 12.37
Data processed at Sun 25May2025 04:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DUNL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DUNL.Stage.Inst.1Hour.0.Ccp-Rev
DUNL.Flow.Inst.1Hour.0.Ccp-Rev
DUNL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.