DUNK1: Neosho River Nr Dunlap, KS

                                SHEF ID:       DUNK1     NEOSHO R NR DUNLAP, KS
STATION TYPE:
Regulating: Stage = 26.00, Flow = 6358

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/25 00:00 0.00 11.80 122 12.37
02/25 01:00 0.00 11.77 116 12.35
02/25 02:00 0.00 11.72 108 12.31
02/25 03:00 0.00 11.79 120 12.31
02/25 04:00 0.00 11.71 108 12.27
02/25 05:00 0.00 11.72 108 12.26
02/25 06:00 0.00 11.75 111 12.21
02/25 07:00 0.00 11.82 127 12.22
02/25 08:00 0.00 11.86 136 12.40
02/25 09:00 0.00 11.86 136 13.97
02/25 10:00 0.00 11.73 109 13.82
02/25 11:00 0.00 11.71 108 13.80
02/25 12:00 0.00 11.73 109 13.95
02/25 13:00 0.00 11.70 107 13.88
02/25 14:00 0.00 11.68 105 13.78
02/25 15:00 0.00 11.67 104 13.37
02/25 16:00 0.00 11.66 103 13.09
02/25 17:00 0.00 11.67 104 12.63
02/25 18:00 0.00 11.67 104 12.63
02/25 19:00 0.00 11.66 103 12.53
02/25 20:00 0.00 11.65 103 12.50
02/25 21:00 0.00 11.65 103 12.47
02/25 22:00 0.00 11.64 102 12.44
02/25 23:00 0.00 11.63 101 12.41
Data processed at Wed 26Feb2025 05:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DUNL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DUNL.Stage.Inst.1Hour.0.Ccp-Rev
DUNL.Flow.Inst.1Hour.0.Ccp-Rev
DUNL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.