DUNK1: Neosho River Nr Dunlap, KS

                                SHEF ID:       DUNK1     NEOSHO R NR DUNLAP, KS
STATION TYPE:
Regulating: Stage = 26.00, Flow = 6358

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/03 00:00 0.00 12.41 261 12.31
02/03 01:00 0.00 12.41 261 12.28
02/03 02:00 0.00 12.45 270 12.26
02/03 03:00 0.00 12.40 259 12.23
02/03 04:00 0.00 12.36 250 12.21
02/03 05:00 0.00 12.32 240 12.19
02/03 06:00 0.00 12.29 234 12.17
02/03 07:00 0.00 12.24 222 12.17
02/03 08:00 0.00 12.19 211 12.27
02/03 09:00 0.00 12.00 168 13.91
02/03 10:00 0.00 12.03 175 13.78
02/03 11:00 0.00 12.21 215 13.47
02/03 12:00 0.00 12.04 177 13.07
02/03 13:00 0.00 12.15 202 13.26
02/03 14:00 0.00 12.10 190 14.22
02/03 15:00 0.00 12.15 202 12.86
02/03 16:00 0.00 12.09 188 12.88
02/03 17:00 0.00 12.12 195 12.67
02/03 18:00 0.00 12.02 172 12.53
02/03 19:00 0.00 11.98 163 12.44
02/03 20:00 0.00 11.96 159 12.39
02/03 21:00 0.00 11.93 152 12.34
02/03 22:00 0.00 11.91 147 12.31
02/03 23:00 0.00 11.95 156 12.27
Data processed at Tue 04Feb2025 05:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DUNL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DUNL.Stage.Inst.1Hour.0.Ccp-Rev
DUNL.Flow.Inst.1Hour.0.Ccp-Rev
DUNL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.