DUNK1: Neosho River Nr Dunlap, KS

                                SHEF ID:       DUNK1     NEOSHO R NR DUNLAP, KS
STATION TYPE:
Regulating: Stage = 26.00, Flow = 6358

PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/05 00:00 0.00 12.28 231 11.99
05/05 01:00 0.00 12.27 229 12.03
05/05 02:00 0.00 12.25 225 11.99
05/05 03:00 0.00 12.25 225 12.04
05/05 04:00 0.00 12.24 222 12.01
05/05 05:00 0.00 12.23 220 11.94
05/05 06:00 0.00 12.22 218 11.92
05/05 07:00 0.00 12.21 215 11.91
05/05 08:00 0.00 12.20 213 12.65
05/05 09:00 0.00 12.19 211 13.15
05/05 10:00 0.00 12.19 211 13.21
05/05 11:00 0.00 12.18 209 13.11
05/05 12:00 0.00 12.16 204 13.12
05/05 13:00 0.00 12.16 204 ----
05/05 14:00 0.00 12.15 202 13.16
05/05 15:00 0.00 12.14 200 13.03
05/05 16:00 0.00 12.14 200 13.00
05/05 17:00 0.00 12.13 197 13.00
05/05 18:00 0.00 12.13 197 12.88
05/05 19:00 0.00 12.12 195 12.93
05/05 20:00 0.00 12.12 195 12.80
05/05 21:00 0.00 12.11 193 12.40
05/05 22:00 0.00 12.11 193 12.20
05/05 23:00 0.00 12.10 190 12.11
Data processed at Mon 06May2024 04:44 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DUNL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DUNL.Stage.Inst.1Hour.0.Ccp-Rev
DUNL.Flow.Inst.1Hour.0.Ccp-Rev
DUNL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.