DUGK1: Little Walnut Rvr nr Bois d'Arc KS

                                SHEF ID:       DUGK1     Little Walnut Rvr nr Bois d'Arc
STATION TYPE:

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/08 00:00 0.00 11.96 2312 12.86 12.57
06/08 01:00 0.00 11.56 2126 12.86 12.56
06/08 02:00 0.00 11.26 1992 12.84 12.55
06/08 03:00 0.00 11.08 1915 12.84 12.54
06/08 04:00 0.00 10.90 1839 12.83 12.53
06/08 05:00 0.00 10.76 1781 12.83 12.53
06/08 06:00 0.00 10.74 1773 12.82 12.51
06/08 07:00 0.00 10.63 1691 12.86 12.53
06/08 08:00 0.00 10.55 1628 12.94 12.60
06/08 09:00 0.00 10.43 1536 13.91 12.83
06/08 10:00 0.00 10.42 1528 13.72 12.84
06/08 11:00 0.00 10.29 1434 13.19 12.73
06/08 12:00 0.00 10.25 1406 13.06 12.70
06/08 13:00 0.00 10.18 1358 13.03 12.66
06/08 14:00 0.00 10.09 1298 13.03 12.62
06/08 15:00 0.00 10.08 1292 13.19 12.67
06/08 16:00 0.00 10.02 1253 13.33 12.67
06/08 17:00 0.00 9.96 1216 13.34 12.70
06/08 18:00 0.00 9.92 1191 13.30 12.68
06/08 19:00 0.00 9.88 1161 13.57 12.70
06/08 20:00 0.00 9.88 1161 13.00 12.68
06/08 21:00 0.00 9.81 1101 12.90 12.61
06/08 22:00 0.00 9.75 1052 12.88 12.59
06/08 23:00 0.00 9.74 1044 12.87 12.57
Data processed at Mon 09Jun2025 04:49 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BOIS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BOIS.Stage.Inst.1Hour.0.Ccp-Rev
BOIS.Flow.Inst.1Hour.0.Ccp-Rev
BOIS.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BOIS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.