Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
11/26 00:00 0.00 5.70 0 12.57 12.49
11/26 01:00 0.00 5.69 0 12.57 12.49
11/26 02:00 0.00 5.68 0 12.57 12.41
11/26 03:00 0.00 5.67 0 12.57 12.41
11/26 04:00 0.00 5.67 0 12.49 12.41
11/26 05:00 0.00 5.66 0 12.49 12.41
11/26 06:00 0.00 5.66 0 12.49 12.41
11/26 07:00 0.00 5.66 0 12.49 12.41
11/26 08:00 0.00 5.66 0 12.49 12.41
11/26 09:00 0.00 5.66 0 12.81 12.49
11/26 10:00 0.00 5.66 0 13.92 13.29
11/26 11:00 0.00 5.66 0 13.53 13.13
11/26 12:00 0.00 5.66 0 14.16 13.13
11/26 13:00 0.00 5.66 0 13.84 13.21
11/26 14:00 0.00 5.66 0 13.44 13.21
11/26 15:00 0.00 5.66 0 13.37 12.97
11/26 16:00 0.00 5.66 0 13.68 12.81
11/26 17:00 0.00 5.66 0 12.89 12.73
11/26 18:00 0.00 5.66 0 12.73 12.65
11/26 19:00 0.00 5.66 0 12.73 12.65
11/26 20:00 0.00 5.66 0 12.65 12.65
11/26 21:00 0.00 5.66 0 12.65 12.57
11/26 22:00 0.00 5.65 0 12.65 12.57
11/26 23:00 ---- ---- ---- ---- ----