Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
10/16 00:00 0.00 6.27 3 12.65 12.57
10/16 01:00 0.00 6.25 2 12.65 12.49
10/16 02:00 0.00 6.24 2 12.57 12.49
10/16 03:00 0.00 6.23 1 12.57 12.49
10/16 04:00 0.00 6.22 1 12.57 12.49
10/16 05:00 0.00 6.21 0 12.57 12.49
10/16 06:00 0.00 6.20 0 12.57 12.49
10/16 07:00 0.00 6.19 0 12.57 12.41
10/16 08:00 0.00 6.18 0 12.57 12.41
10/16 09:00 0.00 6.17 0 12.57 12.41
10/16 10:00 0.00 6.16 0 13.60 12.97
10/16 11:00 0.00 6.16 0 13.84 13.13
10/16 12:00 0.00 6.15 0 14.00 13.05
10/16 13:00 0.00 6.15 0 13.60 13.37
10/16 14:00 0.00 6.13 0 13.37 13.68
10/16 15:00 0.00 6.13 0 13.37 13.53
10/16 16:00 0.00 6.12 0 13.92 13.13
10/16 17:00 0.00 6.11 0 14.00 12.81
10/16 18:00 0.00 6.10 0 12.73 12.65
10/16 19:00 0.00 6.09 0 12.73 12.65
10/16 20:00 0.00 6.08 0 12.73 12.65
10/16 21:00 0.00 6.08 0 12.65 12.57
10/16 22:00 0.00 6.07 0 12.65 12.57
10/16 23:00 0.00 6.06 0 12.65 12.57