Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
10/06 00:00 0.00 5.47 0 12.57 12.49
10/06 01:00 0.00 5.46 0 12.57 12.49
10/06 02:00 0.00 5.45 0 12.57 12.49
10/06 03:00 0.00 5.45 0 12.57 12.49
10/06 04:00 0.00 5.45 0 12.57 12.49
10/06 05:00 0.00 5.45 0 12.57 12.49
10/06 06:00 0.00 5.43 0 12.57 12.49
10/06 07:00 0.00 5.43 0 12.57 12.49
10/06 08:00 0.00 5.43 0 12.57 12.49
10/06 09:00 0.00 5.43 0 12.65 12.49
10/06 10:00 0.00 5.44 0 12.89 12.65
10/06 11:00 0.00 5.44 0 13.29 13.13
10/06 12:00 0.00 5.45 0 14.24 13.05
10/06 13:00 0.00 5.45 0 13.60 12.97
10/06 14:00 0.00 5.45 0 13.68 13.37
10/06 15:00 0.00 5.45 0 13.44 12.89
10/06 16:00 0.00 5.45 0 14.00 12.81
10/06 17:00 0.00 5.45 0 13.76 12.73
10/06 18:00 0.00 5.45 0 12.81 12.73
10/06 19:00 0.00 5.45 0 12.73 12.65
10/06 20:00 0.00 5.45 0 12.73 12.65
10/06 21:00 0.00 5.45 0 12.73 12.65
10/06 22:00 0.00 5.45 0 12.73 12.65
10/06 23:00 0.00 5.45 0 12.65 12.65