Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/14 00:00 0.00 5.80 0 12.65 12.57
09/14 01:00 0.00 5.80 0 12.65 12.57
09/14 02:00 0.00 5.80 0 12.65 12.57
09/14 03:00 0.00 5.80 0 12.65 12.57
09/14 04:00 0.00 5.79 0 12.65 12.57
09/14 05:00 0.00 5.79 0 12.65 12.57
09/14 06:00 0.00 5.79 0 12.65 12.57
09/14 07:00 0.00 5.78 0 12.65 12.57
09/14 08:00 0.00 5.78 0 12.65 12.57
09/14 09:00 0.00 5.77 0 12.65 12.57
09/14 10:00 0.00 5.77 0 12.97 12.81
09/14 11:00 0.00 5.77 0 14.00 12.97
09/14 12:00 0.00 5.77 0 13.68 12.89
09/14 13:00 0.00 5.78 0 13.60 13.05
09/14 14:00 0.00 5.78 0 13.84 13.05
09/14 15:00 0.00 5.77 0 13.84 13.05
09/14 16:00 0.00 5.77 0 12.73 12.65
09/14 17:00 0.09 5.77 0 12.73 12.65
09/14 18:00 0.00 5.77 0 12.73 12.65
09/14 19:00 0.00 5.77 0 12.73 12.65
09/14 20:00 0.00 5.76 0 12.65 12.57
09/14 21:00 0.00 5.76 0 12.65 12.57
09/14 22:00 0.04 5.75 0 12.65 12.57
09/14 23:00 0.04 5.75 0 12.65 12.57