Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/10 00:00 0.00 6.29 4 12.65 12.57
09/10 01:00 0.00 6.28 4 12.65 12.57
09/10 02:00 0.00 6.27 3 12.65 12.57
09/10 03:00 0.00 6.26 3 12.65 12.57
09/10 04:00 0.00 6.25 2 12.65 12.57
09/10 05:00 0.00 6.24 2 12.65 12.49
09/10 06:00 0.00 6.24 2 12.65 12.57
09/10 07:00 0.00 6.23 1 12.65 12.57
09/10 08:00 0.00 6.22 1 12.65 12.49
09/10 09:00 0.00 6.21 0 12.73 12.57
09/10 10:00 0.00 6.21 0 12.97 12.73
09/10 11:00 0.00 6.20 0 14.16 12.89
09/10 12:00 0.00 6.19 0 14.16 12.89
09/10 13:00 0.00 6.19 0 13.68 12.89
09/10 14:00 0.00 6.19 0 14.08 12.97
09/10 15:00 0.00 6.18 0 13.84 12.89
09/10 16:00 0.00 6.17 0 13.68 12.81
09/10 17:00 0.00 6.16 0 13.44 12.73
09/10 18:00 0.00 6.15 0 13.92 12.73
09/10 19:00 0.00 6.15 0 12.73 12.65
09/10 20:00 0.00 6.14 0 12.73 12.65
09/10 21:00 0.00 6.13 0 12.73 12.65
09/10 22:00 0.00 6.13 0 12.65 12.57
09/10 23:00 0.00 6.12 0 12.65 12.57