Downstream station:
SHEF ID: DUGK1 Little Walnut Rvr nr Bois d'Arc
STATION TYPE:
PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/14 00:00 0.00 6.12 0 12.73 12.57
02/14 01:00 0.00 6.11 0 12.65 12.49
02/14 02:00 0.00 6.11 0 12.65 12.41
02/14 03:00 0.00 6.10 0 12.57 12.41
02/14 04:00 0.00 6.10 0 12.57 12.41
02/14 05:00 0.00 6.10 0 12.49 12.33
02/14 06:00 0.00 6.10 0 12.49 12.33
02/14 07:00 0.00 6.09 0 12.49 12.33
02/14 08:00 0.00 6.09 0 12.49 12.25
02/14 09:00 0.00 6.08 0 12.65 12.33
02/14 10:00 0.00 6.08 0 13.44 13.05
02/14 11:00 0.00 6.08 0 13.60 13.29
02/14 12:00 0.00 6.08 0 13.68 13.21
02/14 13:00 0.00 6.09 0 13.92 13.53
02/14 14:00 0.00 6.09 0 14.00 13.29
02/14 15:00 0.00 6.10 0 13.44 13.21
02/14 16:00 0.00 6.10 0 13.44 13.21
02/14 17:00 0.00 6.09 0 13.60 13.21
02/14 18:00 0.00 6.09 0 13.05 12.97
02/14 19:00 0.00 6.10 0 12.97 12.81
02/14 20:00 0.00 6.09 0 12.89 12.73
02/14 21:00 0.00 6.09 0 ---- ----
02/14 22:00 0.00 6.08 0 12.81 12.65
02/14 23:00 0.00 6.08 0 12.73 12.57