DTYO2: Dirty Creek

                                
SHEF ID:       DTYO2     Dirty Creek
STATION TYPE:  
Regulating: Stage =    19.00, Flow =     2766

               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/10 00:00      0.00      8.78       423     12.73     12.65
08/10 01:00      0.00      8.51       392     12.73     12.65
08/10 02:00      0.00      8.26       365     12.73     12.57
08/10 03:00      0.00      8.01       338     12.73     12.57
08/10 04:00      0.00      7.78       313     12.73     12.57
08/10 05:00      0.00      7.56       284     12.73     12.57
08/10 06:00      0.00      7.37       260     12.73     12.57
08/10 07:00      0.00      7.19       239     12.73     12.57
08/10 08:00      0.00      7.04       223     12.73     12.57
08/10 09:00      0.00      6.91       209     12.73     12.65
08/10 10:00      0.00      6.79       197     12.81     12.73
08/10 11:00      0.00      6.69       187     13.21     13.13
08/10 12:00      0.00      6.61       179     13.13     13.13
08/10 13:00      0.00      6.54       173      ----      ----
08/10 14:00      0.00      6.48       167     13.21     13.05
08/10 15:00      0.00      6.42       162     13.21     13.05
08/10 16:00      0.00      6.37       158     13.13     12.97
08/10 17:00      0.00      6.33       154     13.13     12.97
08/10 18:00      0.00      6.29       151     13.05     12.97
08/10 19:00      0.00      6.25       147     12.97     12.89
08/10 20:00      0.00      6.21       144     12.89     12.73
08/10 21:00      0.00      6.18       142     12.89     12.73
08/10 22:00      0.00      6.15       139     12.81     12.73
08/10 23:00      0.00      6.13       138     12.81     12.73

                            
Data processed at Fri 11Aug2023 04:56 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DIRT.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DIRT.Stage.Inst.1Hour.0.Ccp-Rev
DIRT.Flow.Inst.1Hour.0.Ccp-Rev
DIRT.Volt-Battery.Inst.1Hour.0.Ccp-Rev
DIRT.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.