DTYO2: Dirty Creek

                                
SHEF ID:       DTYO2     Dirty Creek
STATION TYPE:  
Regulating: Stage =    19.00, Flow =     2766

               PRECIP     STAGE  RIV-FLOW   VOLTAGE  BAT-LOAD
                   in        ft       cfs      volt      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/08 00:00      0.00      5.10         4     12.81     12.65
08/08 01:00      0.00      5.12         5     12.81     12.65
08/08 02:00      0.00      5.14         5     12.81     12.65
08/08 03:00      0.15      5.18         6     12.73     12.65
08/08 04:00      0.01      5.19         6     12.73     12.65
08/08 05:00      0.37      5.25         8     12.73     12.57
08/08 06:00      0.11      5.28         9     12.73     12.57
08/08 07:00      0.06      5.29         9     12.73     12.57
08/08 08:00      0.01      5.29         9     12.73     12.57
08/08 09:00      0.00      5.28         9     12.73     12.57
08/08 10:00      0.00      5.31        10     12.73     12.57
08/08 11:00      0.00      7.85       321     12.97     12.65
08/08 12:00      0.00      9.21       474     13.37     13.13
08/08 13:00      0.00     10.01       570     13.29     13.21
08/08 14:00      0.00     10.36       610     13.29     13.13
08/08 15:00      0.00     10.51       628     13.29     13.13
08/08 16:00      0.00     10.41       616     13.21     13.05
08/08 17:00      0.00     10.12       583     13.21     13.05
08/08 18:00      0.00      9.74       540     13.13     12.97
08/08 19:00      0.00      9.31       486     13.05     12.89
08/08 20:00      0.00      8.87       433     12.89     12.81
08/08 21:00      0.00      8.45       385     12.89     12.73
08/08 22:00      0.00      8.03       340     12.89     12.73
08/08 23:00      0.00      7.65       296     12.81     12.73

                            
Data processed at Wed 09Aug2023 04:56 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
DIRT.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
DIRT.Stage.Inst.1Hour.0.Ccp-Rev
DIRT.Flow.Inst.1Hour.0.Ccp-Rev
DIRT.Volt-Battery.Inst.1Hour.0.Ccp-Rev
DIRT.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.