CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/06 00:00 0.00 10.75 2752 12.73 12.45
09/06 01:00 0.00 10.76 2762 12.74 12.44
09/06 02:00 0.00 10.80 2805 12.73 12.44
09/06 03:00 0.00 10.88 2891 12.73 12.44
09/06 04:00 0.00 11.00 3024 12.73 12.44
09/06 05:00 0.00 11.19 3241 12.72 12.44
09/06 06:00 0.00 11.39 3480 12.71 12.44
09/06 07:00 0.00 11.63 3784 12.71 12.44
09/06 08:00 0.00 11.88 4121 12.71 12.44
09/06 09:00 0.00 12.13 4460 12.74 12.43
09/06 10:00 0.00 12.40 4848 12.73 12.43
09/06 11:00 0.00 12.60 5152 12.71 12.43
09/06 12:00 0.00 12.78 5421 12.73 12.43
09/06 13:00 0.00 12.96 5690 12.73 12.43
09/06 14:00 0.00 13.07 5859 12.73 12.44
09/06 15:00 0.00 13.16 6000 12.73 12.43
09/06 16:00 0.00 13.27 6176 12.74 12.44
09/06 17:00 0.00 13.37 6339 12.81 12.44
09/06 18:00 0.00 13.40 6388 12.93 12.60
09/06 19:00 0.00 13.46 6488 12.89 12.63
09/06 20:00 0.00 13.51 6566 12.85 12.57
09/06 21:00 0.00 13.56 6640 12.83 12.56
09/06 22:00 0.00 13.59 6684 12.81 12.54
09/06 23:00 0.00 13.61 6714 12.80 12.53
Data processed at Sun 07Sep2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.