CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/20 00:00 0.00 10.80 2805 11.71 11.38
08/20 01:00 0.00 10.80 2805 11.70 11.39
08/20 02:00 0.00 10.79 2794 11.70 11.39
08/20 03:00 0.00 10.78 2783 11.71 11.39
08/20 04:00 0.00 10.77 2773 11.70 11.38
08/20 05:00 0.00 10.76 2762 11.69 11.37
08/20 06:00 0.00 10.73 2731 11.69 11.37
08/20 07:00 0.00 10.71 2710 11.69 11.37
08/20 08:00 0.00 10.69 2689 11.69 11.37
08/20 09:00 0.00 10.67 2669 11.69 11.37
08/20 10:00 0.00 10.65 2648 11.70 11.37
08/20 11:00 0.00 10.62 2618 11.69 11.37
08/20 12:00 0.00 10.60 2598 11.71 11.37
08/20 13:00 0.00 10.59 2588 11.68 11.37
08/20 14:00 0.00 10.58 2578 11.70 11.37
08/20 15:00 0.00 10.57 2568 11.69 11.37
08/20 16:00 0.00 10.55 2548 11.71 11.38
08/20 17:00 0.00 10.54 2538 11.70 11.39
08/20 18:00 0.00 10.53 2528 11.76 11.43
08/20 19:00 0.00 10.51 2508 11.77 11.47
08/20 20:00 0.00 10.51 2508 11.73 11.45
08/20 21:00 0.00 10.51 2508 11.72 11.42
08/20 22:00 0.00 10.51 2508 11.70 11.41
08/20 23:00 0.00 10.51 2508 11.71 11.40
Data processed at Thu 21Aug2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.