CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/16 00:00 0.00 10.98 3002 11.76 11.46
08/16 01:00 0.00 10.94 2957 11.75 11.45
08/16 02:00 0.00 10.97 2990 11.75 11.45
08/16 03:00 0.00 10.99 3013 11.75 11.45
08/16 04:00 0.00 10.97 2990 11.75 11.45
08/16 05:00 0.00 10.95 2968 11.75 11.44
08/16 06:00 0.00 10.95 2968 11.73 11.44
08/16 07:00 0.00 10.96 2979 11.75 11.44
08/16 08:00 0.00 10.96 2979 11.75 11.43
08/16 09:00 0.00 10.95 2968 11.74 11.43
08/16 10:00 0.00 10.95 2968 11.74 11.43
08/16 11:00 0.00 10.98 3002 11.75 11.42
08/16 12:00 0.00 10.94 2957 11.75 11.43
08/16 13:00 0.00 10.94 2957 11.75 11.43
08/16 14:00 0.00 11.04 3070 11.75 11.43
08/16 15:00 0.00 10.99 3013 11.78 11.46
08/16 16:00 0.00 10.94 2957 11.75 11.46
08/16 17:00 0.00 10.98 3002 11.77 11.45
08/16 18:00 0.00 10.96 2979 11.81 11.49
08/16 19:00 0.00 10.95 2968 11.81 11.52
08/16 20:00 0.00 10.96 2979 11.78 11.51
08/16 21:00 0.00 10.93 2946 11.76 11.47
08/16 22:00 0.00 10.93 2946 11.75 11.46
08/16 23:00 0.00 10.98 3002 11.75 11.45
Data processed at Sun 17Aug2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.