CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/05 00:00 0.00 10.95 2968 11.86 11.58
08/05 01:00 0.00 10.95 2968 11.85 11.57
08/05 02:00 0.00 10.95 2968 11.85 11.56
08/05 03:00 0.00 10.94 2957 11.85 11.56
08/05 04:00 0.00 10.93 2946 11.85 11.56
08/05 05:00 0.00 10.92 2935 11.85 11.55
08/05 06:00 0.00 10.90 2913 11.85 11.55
08/05 07:00 0.00 10.88 2891 11.85 11.55
08/05 08:00 0.00 10.84 2848 11.85 11.54
08/05 09:00 0.00 10.81 2815 11.85 11.54
08/05 10:00 0.00 10.77 2773 11.84 11.54
08/05 11:00 0.00 10.71 2710 11.85 11.54
08/05 12:00 0.00 10.67 2669 11.85 11.54
08/05 13:00 0.00 10.61 2608 11.85 11.54
08/05 14:00 0.00 10.57 2568 11.85 11.54
08/05 15:00 0.00 10.52 2518 11.85 11.54
08/05 16:00 0.00 10.47 2469 11.85 11.55
08/05 17:00 0.00 10.43 2427 11.85 11.56
08/05 18:00 0.00 10.39 2383 11.87 11.56
08/05 19:00 0.00 10.35 2339 11.87 11.57
08/05 20:00 0.00 10.32 2306 11.86 11.57
08/05 21:00 0.00 10.30 2285 11.85 11.57
08/05 22:00 0.00 10.28 2263 11.86 11.57
08/05 23:00 0.00 10.26 2242 11.85 11.57
Data processed at Wed 06Aug2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.