CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/20 00:00 0.00 13.56 6640 12.34 12.07
06/20 01:00 0.00 13.41 6405 12.33 12.07
06/20 02:00 0.00 13.29 6208 12.33 12.06
06/20 03:00 0.00 13.17 6016 12.33 12.06
06/20 04:00 0.00 13.06 5844 12.31 12.06
06/20 05:00 0.00 12.96 5690 12.31 12.06
06/20 06:00 0.00 12.86 5540 12.32 12.06
06/20 07:00 0.00 12.77 5406 12.31 12.06
06/20 08:00 0.00 12.67 5261 12.31 12.06
06/20 09:00 0.00 12.58 5121 12.32 12.06
06/20 10:00 0.00 12.49 4983 12.31 12.06
06/20 11:00 0.00 12.40 4848 12.32 12.06
06/20 12:00 0.00 12.32 4731 12.32 12.06
06/20 13:00 0.00 12.23 4601 12.33 12.06
06/20 14:00 0.00 12.15 4488 12.33 12.06
06/20 15:00 0.00 12.09 4404 12.33 12.06
06/20 16:00 0.00 12.00 4281 12.34 12.07
06/20 17:00 0.00 11.95 4214 12.37 12.10
06/20 18:00 0.00 11.89 4134 12.37 12.13
06/20 19:00 0.00 11.84 4066 12.37 12.11
06/20 20:00 0.00 11.78 3984 12.35 12.11
06/20 21:00 0.00 11.75 3944 12.34 12.09
06/20 22:00 0.00 11.72 3903 12.34 12.08
06/20 23:00 0.00 11.68 3850 12.33 12.08
Data processed at Sat 21Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.