CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/27 00:00 0.00 13.50 6551 12.50 12.23
05/27 01:00 0.00 13.44 6455 12.50 12.23
05/27 02:00 0.00 13.37 6339 12.50 12.23
05/27 03:00 0.00 13.31 6241 12.50 12.23
05/27 04:00 0.00 13.25 6144 12.50 12.23
05/27 05:00 0.00 13.20 6064 12.50 12.23
05/27 06:00 0.00 13.17 6016 12.50 12.23
05/27 07:00 0.00 13.12 5937 12.50 12.23
05/27 08:00 0.00 13.09 5891 12.50 12.23
05/27 09:00 0.00 13.04 5813 12.51 12.23
05/27 10:00 0.00 12.98 5721 12.52 12.24
05/27 11:00 0.00 12.92 5630 12.51 12.23
05/27 12:00 0.00 12.84 5510 12.53 12.23
05/27 13:00 0.00 12.75 5377 12.54 12.25
05/27 14:00 0.00 12.63 5198 12.53 12.26
05/27 15:00 0.00 12.52 5029 12.51 12.24
05/27 16:00 0.00 12.41 4863 12.51 12.24
05/27 17:00 0.00 12.28 4673 12.50 12.24
05/27 18:00 0.00 12.14 4474 12.50 12.23
05/27 19:00 0.00 12.01 4295 12.50 12.24
05/27 20:00 0.00 11.87 4108 12.50 12.23
05/27 21:00 0.00 11.75 3944 12.50 12.23
05/27 22:00 0.00 11.62 3771 12.50 12.23
05/27 23:00 0.00 11.50 3617 12.50 12.23
Data processed at Wed 28May2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.