CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/08 00:00 0.00 11.96 4227 12.63 12.34
05/08 01:00 0.00 12.23 4601 12.63 12.34
05/08 02:00 0.00 12.49 4983 12.63 12.34
05/08 03:00 0.00 12.76 5392 12.63 12.34
05/08 04:00 0.00 13.00 5751 12.63 12.34
05/08 05:00 0.00 13.21 6080 12.63 12.34
05/08 06:00 0.00 13.37 6339 12.63 12.34
05/08 07:00 0.00 13.47 6505 12.63 12.33
05/08 08:00 0.00 13.49 6537 12.64 12.34
05/08 09:00 0.00 13.43 6438 12.63 12.34
05/08 10:00 0.00 13.32 6257 12.63 12.34
05/08 11:00 0.00 13.15 5985 12.63 12.34
05/08 12:00 0.00 12.98 5721 12.64 12.34
05/08 13:00 0.00 12.76 5392 12.63 12.34
05/08 14:00 0.00 12.51 5013 12.65 12.34
05/08 15:00 0.00 12.29 4687 12.65 12.35
05/08 16:00 0.00 12.06 4363 12.65 12.36
05/08 17:00 0.00 11.86 4094 12.65 12.36
05/08 18:00 0.00 11.65 3811 12.66 12.36
05/08 19:00 0.00 11.48 3592 12.66 12.36
05/08 20:00 0.00 11.30 3371 12.64 12.36
05/08 21:00 0.00 11.13 3172 12.64 12.36
05/08 22:00 0.00 10.99 3013 12.64 12.36
05/08 23:00 0.00 10.84 2848 12.65 12.36
Data processed at Fri 09May2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.