CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/22 00:00 0.00 14.42 7975 12.84 12.59
04/22 01:00 0.00 13.99 7298 12.84 12.57
04/22 02:00 0.00 13.58 6670 12.84 12.57
04/22 03:00 0.00 13.16 6000 12.83 12.55
04/22 04:00 0.00 12.80 5450 12.83 12.55
04/22 05:00 0.00 12.50 4998 12.82 12.54
04/22 06:00 0.00 12.22 4587 12.82 12.53
04/22 07:00 0.00 11.99 4268 12.80 12.53
04/22 08:00 0.00 11.78 3984 12.86 12.57
04/22 09:00 0.00 11.59 3732 12.94 12.62
04/22 10:00 0.00 11.41 3505 13.09 12.72
04/22 11:00 0.00 11.25 3312 13.24 12.90
04/22 12:00 0.00 11.11 3149 13.58 12.99
04/22 13:00 0.00 10.99 3013 13.88 12.97
04/22 14:00 0.00 10.88 2891 13.88 12.87
04/22 15:00 0.00 10.77 2773 13.50 12.80
04/22 16:00 0.00 10.68 2679 13.49 12.80
04/22 17:00 0.00 10.59 2588 13.59 12.77
04/22 18:00 0.00 10.51 2508 13.52 12.73
04/22 19:00 0.00 10.42 2416 13.41 12.70
04/22 20:00 0.00 10.35 2339 12.90 12.68
04/22 21:00 0.00 10.27 2253 12.86 12.61
04/22 22:00 0.00 10.20 2180 12.86 12.59
04/22 23:00 0.00 10.14 2119 12.85 12.58
Data processed at Wed 23Apr2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.