CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/20 00:00 0.00 8.23 385 12.69 12.40
04/20 01:00 0.00 8.26 404 12.70 12.40
04/20 02:00 0.00 8.32 446 12.67 12.40
04/20 03:00 0.00 8.40 507 12.69 12.40
04/20 04:00 0.00 8.57 655 12.68 12.40
04/20 05:00 0.00 8.78 788 12.67 12.40
04/20 06:00 0.00 9.06 1019 12.70 12.40
04/20 07:00 0.00 9.46 1425 12.68 12.40
04/20 08:00 0.00 9.93 1915 12.70 12.40
04/20 09:00 0.00 10.46 2460 12.76 12.43
04/20 10:00 0.00 11.05 3081 12.89 12.53
04/20 11:00 0.00 11.65 3811 13.26 12.72
04/20 12:00 0.00 12.25 4630 13.17 12.98
04/20 13:00 0.00 12.87 5554 12.94 12.71
04/20 14:00 0.00 13.50 6551 12.85 12.60
04/20 15:00 0.00 14.23 7684 12.94 12.60
04/20 16:00 0.00 14.93 8759 13.19 12.96
04/20 17:00 0.00 15.62 9893 13.13 12.86
04/20 18:00 0.00 16.28 11031 13.51 13.10
04/20 19:00 0.00 16.90 11881 13.13 12.93
04/20 20:00 0.00 17.47 12691 12.96 12.73
04/20 21:00 0.00 18.04 13526 12.90 12.63
04/20 22:00 0.00 18.63 14419 12.88 12.61
04/20 23:00 0.00 19.11 15167 12.86 12.58
Data processed at Mon 21Apr2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.