CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/06 00:00 0.00 15.12 9063 12.80 12.53
03/06 01:00 0.00 14.83 8602 12.80 12.50
03/06 02:00 0.00 14.51 8110 12.77 12.50
03/06 03:00 0.00 14.20 7635 12.76 12.47
03/06 04:00 0.00 13.88 7126 12.76 12.46
03/06 05:00 0.00 13.56 6640 12.73 12.44
03/06 06:00 0.00 13.25 6144 12.72 12.41
03/06 07:00 0.00 12.95 5675 12.67 12.40
03/06 08:00 0.00 12.69 5290 12.76 12.40
03/06 09:00 0.00 12.46 4938 13.13 12.63
03/06 10:00 0.00 12.25 4630 13.52 12.99
03/06 11:00 0.00 12.06 4363 14.31 13.16
03/06 12:00 0.00 11.88 4121 13.68 13.02
03/06 13:00 0.00 11.71 3890 13.79 12.93
03/06 14:00 0.00 11.56 3694 13.81 12.86
03/06 15:00 0.00 11.43 3530 13.42 12.83
03/06 16:00 0.00 11.30 3371 13.89 12.78
03/06 17:00 0.00 11.17 3218 14.38 12.77
03/06 18:00 0.00 11.07 3104 12.94 12.70
03/06 19:00 0.00 10.97 2990 12.90 12.61
03/06 20:00 0.00 10.87 2880 12.87 12.58
03/06 21:00 0.00 10.78 2783 12.84 12.57
03/06 22:00 0.00 10.69 2689 12.84 12.55
03/06 23:00 0.00 10.61 2608 12.83 12.53
Data processed at Fri 07Mar2025 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.