CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/25 00:00 0.00 10.82 2826 12.77 12.51
11/25 01:00 0.00 10.82 2826 12.75 12.50
11/25 02:00 0.00 10.82 2826 12.74 12.48
11/25 03:00 0.00 10.82 2826 12.73 12.48
11/25 04:00 0.00 10.81 2815 12.70 12.46
11/25 05:00 0.00 10.81 2815 12.71 12.45
11/25 06:00 0.00 10.81 2815 12.70 12.44
11/25 07:00 0.00 10.81 2815 12.70 12.44
11/25 08:00 0.00 10.80 2805 12.69 12.42
11/25 09:00 0.00 10.79 2794 12.71 12.42
11/25 10:00 0.00 10.79 2794 12.80 12.46
11/25 11:00 0.00 10.79 2794 13.55 12.93
11/25 12:00 0.00 10.78 2783 13.66 13.09
11/25 13:00 0.00 10.77 2773 13.75 13.00
11/25 14:00 0.00 10.79 2794 14.08 12.95
11/25 15:00 0.00 10.78 2783 13.55 12.89
11/25 16:00 0.00 10.78 2783 13.85 12.82
11/25 17:00 0.00 10.77 2773 12.96 12.75
11/25 18:00 0.00 10.77 2773 12.87 12.63
11/25 19:00 0.00 10.77 2773 12.84 12.60
11/25 20:00 0.00 10.77 2773 12.82 12.57
11/25 21:00 0.00 10.77 2773 12.80 12.54
11/25 22:00 0.00 10.77 2773 12.78 12.53
11/25 23:00 0.00 10.77 2773 12.77 12.51
Data processed at Tue 26Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.