CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/22 00:00 0.00 10.39 2363 12.76 12.50
11/22 01:00 0.00 10.47 2469 12.73 12.48
11/22 02:00 0.00 10.52 2518 12.73 12.47
11/22 03:00 0.00 10.56 2558 12.70 12.45
11/22 04:00 0.00 10.59 2588 12.70 12.44
11/22 05:00 0.00 10.61 2608 12.70 12.43
11/22 06:00 0.00 10.63 2628 12.68 12.41
11/22 07:00 0.00 10.64 2638 12.67 12.40
11/22 08:00 0.00 10.65 2648 12.77 12.41
11/22 09:00 0.00 10.65 2648 13.29 12.78
11/22 10:00 0.00 10.66 2658 13.64 13.09
11/22 11:00 0.00 10.66 2658 13.54 13.03
11/22 12:00 0.00 10.67 2669 13.77 12.97
11/22 13:00 0.00 10.66 2658 13.74 12.92
11/22 14:00 0.00 10.66 2658 13.66 12.86
11/22 15:00 0.00 10.66 2658 13.52 12.82
11/22 16:00 0.00 10.66 2658 14.00 12.76
11/22 17:00 0.00 10.66 2658 12.95 12.76
11/22 18:00 0.00 10.65 2648 12.88 12.64
11/22 19:00 0.00 10.66 2658 12.84 12.60
11/22 20:00 0.00 10.66 2658 12.83 12.58
11/22 21:00 0.00 10.65 2648 12.81 12.55
11/22 22:00 0.00 10.65 2648 12.80 12.53
11/22 23:00 0.00 10.64 2638 12.77 12.52
Data processed at Sat 23Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.