CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/19 00:00 0.00 14.88 8680 12.67 12.42
11/19 01:00 0.00 15.11 9046 12.67 12.42
11/19 02:00 0.00 15.30 9356 12.67 12.42
11/19 03:00 0.00 15.39 9505 12.67 12.41
11/19 04:00 0.00 15.44 9589 12.67 12.41
11/19 05:00 0.00 15.42 9555 12.67 12.40
11/19 06:00 0.00 15.33 9406 12.67 12.40
11/19 07:00 0.00 15.24 9258 12.66 12.40
11/19 08:00 0.00 15.07 8982 12.74 12.42
11/19 09:00 0.00 14.90 8711 12.99 12.63
11/19 10:00 0.00 14.70 8400 13.35 12.86
11/19 11:00 0.00 14.49 8080 13.39 13.03
11/19 12:00 0.00 14.28 7766 13.78 13.06
11/19 13:00 0.00 14.04 7377 13.55 13.01
11/19 14:00 0.00 13.77 6956 13.57 12.94
11/19 15:00 0.00 13.49 6537 13.62 12.89
11/19 16:00 0.00 13.21 6080 13.88 12.85
11/19 17:00 0.00 12.93 5645 12.96 12.80
11/19 18:00 0.00 12.68 5275 12.88 12.65
11/19 19:00 0.00 12.43 4893 12.85 12.61
11/19 20:00 0.00 12.19 4544 12.84 12.59
11/19 21:00 0.00 11.97 4241 12.82 12.58
11/19 22:00 0.00 11.76 3957 12.82 12.56
11/19 23:00 0.00 11.57 3707 12.80 12.55
Data processed at Wed 20Nov2024 05:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.