CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/07 00:00 0.00 10.90 2913 12.80 12.46
07/07 01:00 0.00 10.95 2968 12.80 12.44
07/07 02:00 0.00 10.99 3013 12.77 12.42
07/07 03:00 0.00 11.02 3047 12.76 12.40
07/07 04:00 0.00 11.04 3070 12.73 12.37
07/07 05:00 0.00 11.05 3081 12.71 12.36
07/07 06:00 0.00 11.06 3092 12.70 12.32
07/07 07:00 0.00 11.07 3104 12.72 12.32
07/07 08:00 0.00 11.07 3104 12.86 12.43
07/07 09:00 0.00 11.08 3115 13.13 12.60
07/07 10:00 0.00 11.08 3115 13.59 13.00
07/07 11:00 0.00 11.08 3115 14.08 13.10
07/07 12:00 0.00 11.08 3115 13.66 13.04
07/07 13:00 0.00 11.08 3115 13.93 12.96
07/07 14:00 0.00 11.09 3127 13.89 12.93
07/07 15:00 0.00 11.09 3127 14.27 12.88
07/07 16:00 0.00 11.10 3138 13.48 12.90
07/07 17:00 0.00 11.09 3127 13.65 12.80
07/07 18:00 0.00 11.10 3138 13.51 12.83
07/07 19:00 0.00 11.11 3149 14.20 12.82
07/07 20:00 0.00 11.11 3149 13.60 12.80
07/07 21:00 0.00 11.11 3149 13.03 12.70
07/07 22:00 0.00 11.12 3161 12.91 12.56
07/07 23:00 0.00 11.12 3161 12.86 12.48
Data processed at Mon 08Jul2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.