CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/20 00:00 0.00 10.21 2117 12.82 12.45
06/20 01:00 0.00 10.18 2078 12.80 12.45
06/20 02:00 0.00 10.15 2040 12.80 12.44
06/20 03:00 0.00 10.13 2015 12.78 12.43
06/20 04:00 0.00 10.12 2002 12.77 12.40
06/20 05:00 0.00 10.10 1978 12.74 12.39
06/20 06:00 0.00 10.09 1965 12.73 12.36
06/20 07:00 0.00 10.08 1953 12.74 12.35
06/20 08:00 0.00 10.07 1941 12.79 12.39
06/20 09:00 0.00 10.06 1929 12.92 12.47
06/20 10:00 0.00 10.06 1929 13.13 12.66
06/20 11:00 0.00 10.05 1917 13.55 12.93
06/20 12:00 0.00 10.04 1905 13.69 13.11
06/20 13:00 0.00 10.04 1905 13.65 13.01
06/20 14:00 0.00 10.03 1893 13.91 12.93
06/20 15:00 0.00 10.03 1893 13.93 12.90
06/20 16:00 0.00 10.03 1893 13.49 12.87
06/20 17:00 0.00 10.02 1881 14.09 12.86
06/20 18:00 0.00 10.02 1881 13.51 12.84
06/20 19:00 0.00 10.02 1881 14.01 12.83
06/20 20:00 0.00 10.01 1869 13.05 12.77
06/20 21:00 0.00 10.01 1869 12.92 12.60
06/20 22:00 0.00 10.01 1869 12.85 12.51
06/20 23:00 0.00 10.01 1869 12.83 12.47
Data processed at Fri 21Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.