CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/18 00:00 0.00 14.09 7457 12.82 12.46
06/18 01:00 0.00 14.07 7425 12.80 12.45
06/18 02:00 0.00 14.03 7361 12.80 12.44
06/18 03:00 0.00 13.98 7282 12.78 12.42
06/18 04:00 0.00 13.90 7157 12.77 12.40
06/18 05:00 0.00 13.79 6987 12.75 12.39
06/18 06:00 0.00 13.67 6804 12.73 12.37
06/18 07:00 0.00 13.54 6610 12.73 12.34
06/18 08:00 0.00 13.39 6372 12.86 12.44
06/18 09:00 0.00 13.24 6128 12.91 12.51
06/18 10:00 0.00 13.08 5875 13.02 12.54
06/18 11:00 0.00 12.93 5645 13.24 12.73
06/18 12:00 0.00 12.77 5406 13.49 13.13
06/18 13:00 0.00 12.63 5198 13.53 13.03
06/18 14:00 0.00 12.49 4983 13.59 12.93
06/18 15:00 0.00 12.38 4819 13.66 12.90
06/18 16:00 0.00 12.26 4644 13.65 12.88
06/18 17:00 0.00 12.17 4516 13.64 12.84
06/18 18:00 0.00 12.08 4391 13.68 12.83
06/18 19:00 0.00 12.02 4308 13.90 12.82
06/18 20:00 0.00 11.94 4201 13.06 12.76
06/18 21:00 0.00 11.89 4134 12.93 12.60
06/18 22:00 0.00 11.84 4066 12.86 12.50
06/18 23:00 0.00 11.80 4011 12.82 12.46
Data processed at Wed 19Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.