CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/11 00:00 0.00 17.03 12064 12.81 12.46
06/11 01:00 0.00 16.37 11153 12.80 12.44
06/11 02:00 0.00 15.76 10134 12.77 12.43
06/11 03:00 0.00 15.22 9225 12.76 12.40
06/11 04:00 0.00 14.76 8492 12.73 12.39
06/11 05:00 0.00 14.37 7901 12.71 12.36
06/11 06:00 0.00 14.03 7361 12.70 12.32
06/11 07:00 0.00 13.73 6895 12.69 12.32
06/11 08:00 0.00 13.45 6471 12.76 12.34
06/11 09:00 0.00 13.22 6096 12.93 12.46
06/11 10:00 ---- ---- ---- ---- ----
06/11 11:00 ---- 12.88 5569 ---- ----
06/11 12:00 0.00 12.74 5362 13.75 13.19
06/11 13:00 0.00 12.60 5152 13.65 13.10
06/11 14:00 0.00 12.47 4953 ---- ----
06/11 15:00 0.00 12.37 4804 14.17 12.94
06/11 16:00 ---- ---- ---- ---- ----
06/11 17:00 ---- 12.18 4530 ---- ----
06/11 18:00 0.00 12.10 4418 14.22 12.84
06/11 19:00 0.00 12.03 4322 13.80 12.87
06/11 20:00 0.00 11.96 4227 13.07 12.76
06/11 21:00 0.00 11.90 4148 12.93 12.61
06/11 22:00 0.00 11.84 4066 12.86 12.53
06/11 23:00 0.00 11.79 3998 12.83 12.47
Data processed at Wed 12Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.