CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/07 00:00 0.00 11.70 3877 12.81 12.46
06/07 01:00 0.00 11.64 3797 12.79 12.44
06/07 02:00 0.00 11.58 3719 12.78 12.42
06/07 03:00 0.00 11.53 3655 12.77 12.40
06/07 04:00 0.00 11.48 3592 12.75 12.38
06/07 05:00 0.00 11.43 3530 12.72 12.37
06/07 06:00 0.00 11.39 3480 12.70 12.34
06/07 07:00 0.00 11.35 3432 12.70 12.34
06/07 08:00 0.00 11.32 3395 12.73 12.36
06/07 09:00 0.00 11.28 3347 12.81 12.40
06/07 10:00 0.00 11.25 3312 12.96 12.48
06/07 11:00 0.00 11.23 3288 13.32 12.71
06/07 12:00 0.00 11.21 3265 13.78 13.21
06/07 13:00 0.00 11.18 3230 13.57 13.10
06/07 14:00 0.00 11.16 3207 13.65 13.01
06/07 15:00 0.00 11.14 3184 13.85 12.94
06/07 16:00 0.00 11.13 3172 13.56 12.90
06/07 17:00 0.00 11.12 3161 14.23 12.90
06/07 18:00 0.00 11.10 3138 14.18 12.90
06/07 19:00 0.00 11.09 3127 14.08 12.90
06/07 20:00 0.00 11.08 3115 13.09 12.81
06/07 21:00 0.00 11.06 3092 12.94 12.61
06/07 22:00 0.00 11.05 3081 12.87 12.53
06/07 23:00 0.00 11.03 3058 12.84 12.48
Data processed at Sat 08Jun2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.