CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/22 00:00 0.00 12.22 4587 12.81 12.47
05/22 01:00 0.00 12.21 4572 12.79 12.44
05/22 02:00 0.00 12.20 4558 12.78 12.42
05/22 03:00 0.00 12.18 4530 12.77 12.40
05/22 04:00 0.00 12.15 4488 12.76 12.40
05/22 05:00 0.00 12.10 4418 12.73 12.39
05/22 06:00 0.00 12.05 4349 12.72 12.37
05/22 07:00 0.00 11.97 4241 12.72 12.34
05/22 08:00 0.00 11.87 4108 12.80 12.38
05/22 09:00 0.00 11.77 3971 13.15 12.54
05/22 10:00 0.00 11.65 3811 13.46 12.86
05/22 11:00 0.00 11.53 3655 13.49 13.16
05/22 12:00 0.00 11.40 3493 13.50 13.11
05/22 13:00 0.00 11.27 3335 13.49 13.07
05/22 14:00 0.00 11.14 3184 13.49 13.03
05/22 15:00 0.00 11.03 3058 13.52 12.96
05/22 16:00 0.00 10.92 2935 13.63 12.94
05/22 17:00 0.00 10.82 2826 13.69 12.93
05/22 18:00 0.00 10.73 2731 13.52 12.90
05/22 19:00 0.00 10.64 2638 13.64 12.91
05/22 20:00 0.00 10.57 2568 13.09 12.80
05/22 21:00 0.00 10.51 2508 12.96 12.65
05/22 22:00 0.00 10.45 2450 12.88 12.53
05/22 23:00 0.00 10.40 2377 12.83 12.49
Data processed at Thu 23May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.