CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/20 00:00 0.05 12.33 4745 12.82 12.46
05/20 01:00 0.00 12.34 4760 12.80 12.44
05/20 02:00 0.00 12.34 4760 12.79 12.43
05/20 03:00 0.00 12.36 4789 12.77 12.42
05/20 04:00 0.00 12.36 4789 12.76 12.40
05/20 05:00 0.00 12.38 4819 12.73 12.38
05/20 06:00 0.00 12.39 4833 12.72 12.35
05/20 07:00 0.00 12.39 4833 12.71 12.34
05/20 08:00 0.00 12.38 4819 12.76 12.34
05/20 09:00 0.00 12.36 4789 13.07 12.53
05/20 10:00 0.00 12.35 4775 13.32 12.83
05/20 11:00 0.00 12.34 4760 14.04 13.13
05/20 12:00 0.00 12.34 4760 13.51 13.11
05/20 13:00 0.00 12.35 4775 13.51 13.01
05/20 14:00 0.00 12.35 4775 13.49 12.94
05/20 15:00 0.00 12.35 4775 13.91 12.90
05/20 16:00 0.00 12.37 4804 13.95 12.90
05/20 17:00 0.00 12.37 4804 13.85 12.90
05/20 18:00 0.00 12.38 4819 13.59 12.88
05/20 19:00 0.00 12.38 4819 13.82 12.90
05/20 20:00 0.00 12.38 4819 13.07 12.79
05/20 21:00 0.00 12.37 4804 12.93 12.62
05/20 22:00 0.00 12.37 4804 12.86 12.53
05/20 23:00 0.00 12.37 4804 12.83 12.48
Data processed at Tue 21May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.