CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/18 00:00 0.00 10.73 2731 12.82 12.48
05/18 01:00 0.00 10.74 2741 12.81 12.47
05/18 02:00 0.00 10.76 2762 12.80 12.44
05/18 03:00 0.00 10.81 2815 12.78 12.43
05/18 04:00 0.00 10.89 2902 12.77 12.40
05/18 05:00 0.00 10.98 3002 12.75 12.38
05/18 06:00 0.00 11.11 3149 12.72 12.37
05/18 07:00 0.00 11.24 3300 12.71 12.35
05/18 08:00 0.00 11.38 3468 12.77 12.36
05/18 09:00 0.00 11.52 3643 12.84 12.42
05/18 10:00 0.00 11.64 3797 12.96 12.52
05/18 11:00 0.00 11.76 3957 13.14 12.65
05/18 12:00 0.00 11.86 4094 13.44 12.90
05/18 13:00 0.00 11.95 4214 13.51 13.11
05/18 14:00 0.00 12.03 4322 13.49 13.09
05/18 15:00 0.00 12.09 4404 13.98 13.00
05/18 16:00 0.00 12.14 4474 13.66 12.99
05/18 17:00 0.00 12.17 4516 13.77 12.94
05/18 18:00 0.00 12.22 4587 14.23 12.92
05/18 19:00 0.00 12.25 4630 13.17 12.88
05/18 20:00 0.00 12.28 4673 13.01 12.77
05/18 21:00 0.00 12.29 4687 12.90 12.63
05/18 22:00 0.00 12.30 4702 12.85 12.55
05/18 23:00 0.00 12.32 4731 12.83 12.53
Data processed at Sun 19May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.