CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/14 00:00 0.00 10.41 2389 12.86 12.48
03/14 01:00 0.00 10.39 2360 12.84 12.48
03/14 02:00 0.00 10.41 2389 12.82 12.47
03/14 03:00 0.43 10.40 2374 12.82 12.44
03/14 04:00 0.34 10.47 2469 12.80 12.44
03/14 05:00 0.00 10.46 2460 12.79 12.42
03/14 06:00 0.00 10.45 2450 12.76 12.40
03/14 07:00 0.00 10.45 2450 12.75 12.39
03/14 08:00 0.00 10.45 2450 12.73 12.37
03/14 09:00 0.00 10.45 2450 12.86 12.40
03/14 10:00 0.00 10.45 2450 13.16 12.64
03/14 11:00 0.00 10.45 2450 13.82 13.14
03/14 12:00 0.00 10.41 2389 13.56 13.08
03/14 13:00 0.00 10.44 2435 13.49 13.01
03/14 14:00 0.00 10.44 2435 14.01 12.93
03/14 15:00 0.00 10.45 2450 13.55 12.90
03/14 16:00 0.00 10.45 2450 14.00 12.91
03/14 17:00 0.00 10.45 2450 13.82 12.90
03/14 18:00 0.00 10.45 2450 13.62 12.89
03/14 19:00 0.00 10.46 2460 13.29 12.92
03/14 20:00 0.00 10.48 2479 13.01 12.74
03/14 21:00 0.00 10.49 2489 12.91 12.61
03/14 22:00 0.00 10.50 2498 12.87 12.54
03/14 23:00 0.00 10.51 2508 12.84 12.50
Data processed at Fri 15Mar2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.