CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
03/09 00:00 0.00 12.50 4921 12.80 12.42
03/09 01:00 0.00 12.60 5119 12.77 12.41
03/09 02:00 0.00 12.64 5200 12.76 12.38
03/09 03:00 0.00 12.62 5159 12.73 12.36
03/09 04:00 0.00 12.57 5059 12.70 12.32
03/09 05:00 0.00 12.49 4902 12.68 12.31
03/09 06:00 0.00 12.37 4673 12.65 12.27
03/09 07:00 0.00 12.25 4453 12.63 12.25
03/09 08:00 0.00 12.10 4190 12.70 12.27
03/09 09:00 0.00 11.95 3940 12.86 12.36
03/09 10:00 0.00 11.79 3637 13.53 12.88
03/09 11:00 0.00 11.64 3331 13.50 13.15
03/09 12:00 0.00 11.48 3030 13.57 13.14
03/09 13:00 0.00 11.34 2786 13.56 13.13
03/09 14:00 0.00 11.21 2574 13.51 13.13
03/09 15:00 0.00 11.07 2364 13.50 13.11
03/09 16:00 0.00 10.95 2260 13.51 13.08
03/09 17:00 0.00 10.83 2160 14.01 13.03
03/09 18:00 0.00 10.72 2071 13.31 13.02
03/09 19:00 0.00 10.62 1993 13.09 12.82
03/09 20:00 0.00 10.52 1917 12.98 12.66
03/09 21:00 0.00 10.44 1858 12.90 12.57
03/09 22:00 0.00 10.35 1793 12.86 12.52
03/09 23:00 0.00 10.26 1730 12.83 12.48
Data processed at Sun 10Mar2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.