CNUK1: Grand River, Chanute
Data processed at Thu 13Apr2023 04:49 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: CNUK1 NEOSHO R NR CHANUTE, KS STATION TYPE: Regulating: Stage = 22.00, Flow = 20159 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/12 00:00 0.00 9.95 1939 12.81 12.65 04/12 01:00 0.00 9.86 1849 12.73 12.65 04/12 02:00 0.00 9.78 1772 12.73 12.65 04/12 03:00 0.00 9.71 1707 12.73 12.57 04/12 04:00 0.00 9.64 1643 12.73 12.57 04/12 05:00 0.00 9.58 1591 12.65 12.57 04/12 06:00 0.00 9.52 1539 12.65 12.57 04/12 07:00 0.00 9.47 1497 12.65 12.57 04/12 08:00 0.00 9.43 1465 12.65 12.49 04/12 09:00 0.00 9.39 1433 12.65 12.57 04/12 10:00 0.00 9.36 1409 12.89 12.65 04/12 11:00 0.00 9.33 1385 13.21 12.81 04/12 12:00 0.00 9.30 1362 13.68 13.60 04/12 13:00 0.00 9.25 1319 13.84 13.44 04/12 14:00 0.00 9.23 1293 13.60 13.84 04/12 15:00 0.00 9.21 1268 13.60 13.68 04/12 16:00 0.00 9.22 1280 14.08 13.60 04/12 17:00 0.00 9.15 1194 13.53 13.60 04/12 18:00 0.00 9.18 1231 13.44 13.13 04/12 19:00 0.00 9.18 1231 13.53 12.97 04/12 20:00 0.00 9.16 1206 12.89 12.81 04/12 21:00 0.00 9.15 1194 12.81 12.73 04/12 22:00 0.00 9.12 1159 12.81 12.65 04/12 23:00 0.00 9.10 1136 12.81 12.65