CNUK1: Grand River, Chanute
Data processed at Fri 17Mar2023 04:49 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: CNUK1 NEOSHO R NR CHANUTE, KS STATION TYPE: Regulating: Stage = 22.00, Flow = 20159 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/16 00:00 0.00 8.28 459 12.81 12.65 03/16 01:00 0.00 8.23 430 12.81 12.65 03/16 02:00 0.00 8.23 430 12.81 12.65 03/16 03:00 0.00 8.21 420 12.73 12.65 03/16 04:00 0.00 8.21 420 12.73 12.65 03/16 05:00 0.00 8.18 394 12.73 12.65 03/16 06:00 0.00 8.14 362 12.73 12.57 03/16 07:00 0.00 8.14 362 12.73 12.57 03/16 08:00 0.00 8.14 362 12.73 12.57 03/16 09:00 0.00 8.12 345 12.73 12.57 03/16 10:00 0.00 8.11 336 12.97 12.65 03/16 11:00 0.00 8.09 320 12.97 12.73 03/16 12:00 0.00 8.08 311 12.97 12.81 03/16 13:00 0.00 8.05 289 13.29 13.13 03/16 14:00 0.02 8.04 283 13.13 13.13 03/16 15:00 0.25 8.05 289 13.21 12.89 03/16 16:00 0.00 8.04 283 13.13 13.05 03/16 17:00 0.00 8.02 271 12.97 12.89 03/16 18:00 0.00 8.03 277 12.89 12.81 03/16 19:00 0.00 8.01 265 12.81 12.65 03/16 20:00 0.00 7.99 253 12.73 12.65 03/16 21:00 0.00 7.98 248 12.73 12.57 03/16 22:00 0.00 7.97 243 12.65 12.57 03/16 23:00 0.00 7.95 232 12.65 12.49