CNUK1: Grand River, Chanute
Data processed at Thu 09Mar2023 05:49 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: CNUK1 NEOSHO R NR CHANUTE, KS STATION TYPE: Regulating: Stage = 22.00, Flow = 20159 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/08 00:00 0.00 8.47 582 12.65 12.57 03/08 01:00 0.00 8.49 597 12.65 12.57 03/08 02:00 0.00 8.49 597 12.65 12.49 03/08 03:00 0.00 8.49 597 12.65 12.49 03/08 04:00 0.00 8.50 605 12.65 12.49 03/08 05:00 0.00 8.49 597 12.65 12.49 03/08 06:00 0.00 8.50 605 12.65 12.49 03/08 07:00 0.00 8.50 605 12.65 12.49 03/08 08:00 0.00 8.50 605 12.65 12.49 03/08 09:00 0.00 8.50 605 12.65 12.49 03/08 10:00 0.00 8.50 605 12.89 12.65 03/08 11:00 0.00 8.50 605 13.05 12.89 03/08 12:00 0.00 8.50 605 13.21 13.05 03/08 13:00 0.00 8.51 612 13.53 13.29 03/08 14:00 0.00 8.51 612 13.21 13.21 03/08 15:00 0.00 8.52 620 13.13 12.97 03/08 16:00 0.00 8.52 620 12.97 12.89 03/08 17:00 0.00 8.54 635 12.89 12.81 03/08 18:00 0.00 8.55 643 12.81 12.73 03/08 19:00 0.00 8.57 657 12.73 12.65 03/08 20:00 0.00 8.59 671 12.65 12.57 03/08 21:00 0.00 8.61 685 12.65 12.57 03/08 22:00 0.00 8.62 693 12.65 12.49 03/08 23:00 0.00 8.65 715 12.65 12.49