CNUK1: Grand River, Chanute
Data processed at Sat 07Jan2023 05:47 GMT
All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice.
Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited.
These data are gathered electronically and, as presented, have not undergone any form of quality control. These data are not guaranteed to be valid or correct.
Go to home page.
Go to station list.
Upstream stations:
Downstream station:Previous Day
Next Day
Current Day
SHEF ID: CNUK1 NEOSHO R NR CHANUTE, KS STATION TYPE: Regulating: Stage = 22.00, Flow = 20159 PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD in ft cfs volt volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 01/06 00:00 0.00 8.10 328 12.73 12.57 01/06 01:00 0.00 8.09 320 12.73 12.57 01/06 02:00 0.00 8.08 311 12.65 12.57 01/06 03:00 0.00 8.07 304 12.65 12.49 01/06 04:00 0.00 8.06 296 12.65 12.49 01/06 05:00 0.00 8.05 289 12.57 12.41 01/06 06:00 0.00 8.05 289 12.57 12.41 01/06 07:00 0.00 8.04 283 12.57 12.41 01/06 08:00 0.00 8.03 277 12.57 12.41 01/06 09:00 0.00 8.03 277 12.65 12.41 01/06 10:00 0.00 8.02 271 12.97 12.65 01/06 11:00 0.00 7.96 237 13.60 13.05 01/06 12:00 0.00 7.94 227 13.84 13.44 01/06 13:00 0.00 7.93 222 13.92 13.37 01/06 14:00 0.00 7.96 237 14.16 13.29 01/06 15:00 0.00 7.93 222 13.68 13.29 01/06 16:00 0.00 7.97 243 13.37 13.29 01/06 17:00 0.00 7.96 237 13.05 13.05 01/06 18:00 0.00 7.96 237 12.97 12.81 01/06 19:00 0.00 7.95 232 12.89 12.73 01/06 20:00 0.00 7.94 227 12.81 12.73 01/06 21:00 0.00 7.94 227 12.81 12.65 01/06 22:00 0.00 7.93 222 12.81 12.65 01/06 23:00 0.00 7.90 208 12.81 12.65