CLIO2: Washita River Nr Clinton, OK

                                SHEF ID:       CLIO2     Washita River near Clinton, OK
STATION TYPE:
Regulating: Stage = 18.00, Flow = 2090

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/09 00:00 0.00 12.27 1025 12.50 ----
06/09 01:00 0.00 12.57 1079 12.50 ----
06/09 02:00 0.00 12.92 1142 12.49 ----
06/09 03:00 0.00 13.31 1211 12.48 ----
06/09 04:00 0.00 13.66 1273 12.46 ----
06/09 05:00 0.00 13.70 1280 12.45 ----
06/09 06:00 0.00 13.92 1320 12.45 ----
06/09 07:00 0.00 14.16 1362 12.56 ----
06/09 08:00 0.00 14.30 1386 13.22 ----
06/09 09:00 0.00 14.48 1418 14.09 ----
06/09 10:00 0.00 14.52 1425 13.59 ----
06/09 11:00 0.00 14.48 1418 13.55 ----
06/09 12:00 0.00 14.39 1402 13.53 ----
06/09 13:00 0.00 14.22 1372 13.54 ----
06/09 14:00 0.00 14.05 1343 13.53 ----
06/09 15:00 0.00 13.87 1311 13.75 ----
06/09 16:00 0.00 13.67 1275 13.33 ----
06/09 17:00 0.00 13.49 1243 13.04 ----
06/09 18:00 0.00 13.34 1216 12.93 ----
06/09 19:00 0.00 13.19 1189 12.79 ----
06/09 20:00 0.00 13.02 1160 12.63 ----
06/09 21:00 0.00 12.86 1131 12.59 ----
06/09 22:00 0.00 12.70 1102 12.57 ----
06/09 23:00 0.00 12.53 1071 12.55 ----
Data processed at Tue 10Jun2025 04:42 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CLIN.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CLIN.Stage.Inst.1Hour.0.Ccp-Rev
CLIN.Flow.Inst.1Hour.0.Ccp-Rev
CLIN.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CLIN.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.