Upstream stations:
Downstream station:
SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS
STATION TYPE:
Regulating: Stage = 15.00, Flow = 1525
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
06/27 00:00 0.00 3.00 5 12.77
06/27 01:00 0.00 3.00 5 12.77
06/27 02:00 0.01 2.99 5 12.71
06/27 03:00 0.00 2.99 5 12.71
06/27 04:00 0.00 2.99 5 12.71
06/27 05:00 0.00 2.98 4 12.65
06/27 06:00 0.00 2.98 4 12.65
06/27 07:00 0.00 2.97 4 12.65
06/27 08:00 0.00 2.97 4 13.18
06/27 09:00 0.00 2.97 4 13.36
06/27 10:00 0.00 2.96 4 13.59
06/27 11:00 0.00 2.96 4 13.42
06/27 12:00 0.00 2.95 4 13.83
06/27 13:00 0.00 2.94 3 ----
06/27 14:00 0.00 2.94 3 13.12
06/27 15:00 0.00 2.94 3 13.12
06/27 16:00 0.00 2.94 3 13.07
06/27 17:00 0.00 2.94 3 13.07
06/27 18:00 0.00 2.94 3 13.00
06/27 19:00 0.00 2.93 3 12.89
06/27 20:00 0.00 2.93 3 12.83
06/27 21:00 0.00 2.93 3 12.83
06/27 22:00 0.00 2.92 3 12.77
06/27 23:00 0.00 2.92 3 12.77