Upstream stations:
Downstream station:
SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS
STATION TYPE:
Regulating: Stage = 15.00, Flow = 1525
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
04/29 00:00 0.00 2.81 2 12.77
04/29 01:00 0.00 2.82 2 12.71
04/29 02:00 0.00 2.82 2 12.71
04/29 03:00 0.00 2.82 2 12.65
04/29 04:00 0.00 2.83 2 12.65
04/29 05:00 0.00 2.82 2 12.65
04/29 06:00 0.00 2.82 2 12.65
04/29 07:00 0.02 2.82 2 ----
04/29 08:00 0.00 2.82 2 12.65
04/29 09:00 0.00 2.82 2 12.89
04/29 10:00 0.00 2.81 2 13.12
04/29 11:00 0.00 2.81 2 12.95
04/29 12:00 0.00 2.81 2 12.89
04/29 13:00 0.00 2.81 2 13.30
04/29 14:00 0.00 2.82 2 13.53
04/29 15:00 0.00 2.82 2 13.48
04/29 16:00 0.00 2.83 2 13.30
04/29 17:00 0.00 2.84 2 13.12
04/29 18:00 0.00 2.85 2 13.07
04/29 19:00 0.00 2.85 2 13.00
04/29 20:00 0.00 2.85 2 12.89
04/29 21:00 0.00 2.86 2 12.89
04/29 22:00 0.00 2.86 2 12.83
04/29 23:00 0.00 2.86 2 12.83