Upstream stations:
Downstream station:
SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS
STATION TYPE:
Regulating: Stage = 15.00, Flow = 1525
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
03/04 00:00 0.00 3.02 5 12.65
03/04 01:00 0.00 3.01 5 ----
03/04 02:00 0.00 3.01 5 12.65
03/04 03:00 0.00 3.00 5 12.60
03/04 04:00 0.00 3.00 5 12.60
03/04 05:00 0.00 3.00 5 12.60
03/04 06:00 0.00 2.99 5 12.54
03/04 07:00 0.00 2.99 5 12.54
03/04 08:00 0.00 2.99 5 12.71
03/04 09:00 0.00 3.00 5 13.48
03/04 10:00 0.00 3.00 5 13.83
03/04 11:00 0.00 3.01 5 13.94
03/04 12:00 0.00 3.01 5 13.36
03/04 13:00 0.00 3.01 5 13.30
03/04 14:00 0.00 3.02 5 13.18
03/04 15:00 0.00 3.02 5 13.18
03/04 16:00 0.00 3.02 5 13.12
03/04 17:00 0.00 3.02 5 13.07
03/04 18:00 0.00 3.02 5 13.00
03/04 19:00 0.00 3.02 5 12.89
03/04 20:00 0.00 3.02 5 12.89
03/04 21:00 0.00 3.02 5 12.83
03/04 22:00 0.00 3.02 5 12.77
03/04 23:00 0.00 3.02 5 12.77