Upstream stations:
Downstream station:
SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS
STATION TYPE:
Regulating: Stage = 15.00, Flow = 1525
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/08 00:00 0.00 3.04 6 12.65
02/08 01:00 0.00 3.04 6 12.60
02/08 02:00 0.00 3.03 6 12.60
02/08 03:00 0.00 3.03 6 12.60
02/08 04:00 0.00 3.03 6 12.54
02/08 05:00 0.00 3.03 6 12.54
02/08 06:00 0.00 3.02 5 12.54
02/08 07:00 0.00 3.02 5 12.54
02/08 08:00 0.00 3.02 5 12.54
02/08 09:00 0.00 3.03 6 13.77
02/08 10:00 0.00 3.03 6 13.83
02/08 11:00 0.00 3.03 6 ----
02/08 12:00 0.00 3.04 6 13.88
02/08 13:00 0.00 3.04 6 13.88
02/08 14:00 0.00 3.04 6 13.59
02/08 15:00 0.00 3.04 6 13.83
02/08 16:00 0.00 3.04 6 13.48
02/08 17:00 0.00 3.04 6 13.24
02/08 18:00 0.00 3.05 6 12.95
02/08 19:00 0.00 3.05 6 12.83
02/08 20:00 0.00 3.05 6 12.77
02/08 21:00 0.00 3.04 6 12.71
02/08 22:00 0.00 3.04 6 ----
02/08 23:00 0.00 3.04 6 12.71