Upstream stations:
Downstream station:
SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS
STATION TYPE:
Regulating: Stage = 15.00, Flow = 1525
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
08/28 00:00 0.00 2.78 1 12.77
08/28 01:00 0.00 2.78 1 12.71
08/28 02:00 0.00 2.77 1 12.71
08/28 03:00 0.00 2.77 1 ----
08/28 04:00 0.00 2.77 1 12.71
08/28 05:00 0.00 2.76 1 12.65
08/28 06:00 0.00 2.76 1 12.65
08/28 07:00 0.00 2.75 1 12.65
08/28 08:00 0.00 2.76 1 12.65
08/28 09:00 0.00 2.76 1 12.95
08/28 10:00 0.00 2.76 1 13.18
08/28 11:00 0.00 2.76 1 13.30
08/28 12:00 0.00 2.76 1 13.36
08/28 13:00 0.00 2.76 1 13.42
08/28 14:00 0.00 2.76 1 13.30
08/28 15:00 0.00 2.76 1 14.06
08/28 16:00 0.00 2.76 1 14.06
08/28 17:00 0.00 2.76 1 13.30
08/28 18:00 0.00 2.76 1 13.00
08/28 19:00 0.00 2.76 1 13.00
08/28 20:00 0.00 2.76 1 12.89
08/28 21:00 0.00 2.77 1 12.83
08/28 22:00 0.00 2.77 1 12.83
08/28 23:00 0.00 2.77 1 12.77